Shun Luen Factory Building Moving
SHUN LUEN FACTORY BUILDING commercial moving — Kowloon City District
Shun Luen Factory Building
Shun Luen Factory Building is located at 86 To Kwa Wan Road, Kowloon City District, and is an industrial property. For moving enquiries, please provide the unit floor, item list, dimensions and weight, and details of lift access and vehicle loading arrangements, then confirm the scope of service and quotation.
Shun Luen Factory Building relocation: prepare by item type
No. 86 To Kwa Wan Road identifies the location of Shun Leung Industrial Building, but it cannot replace unit and cargo details. First classify office furniture, shelving, stock and special equipment, then check the protection, dismantling and moving conditions item by item.
Office furniture and documents
Mark the new location and handover person
List office desks, chairs and filing cabinets item by item; take separate photos of desk glass, drawers and detachable parts. Number file boxes by department or new seat; list items to be moved first or last, and arrange for the handover contact to check them. When quoting, also state the available time slots for both the departure and destination units.
View office relocation preparation
Shelves and stock
Count first, then confirm assembly and dismantling
Please provide the number of sets of shelves, length, width and height, structure and fixing method, and state whether dismantling and reassembly are required. For stock, organise by number of boxes, outer box dimensions and weight per box; if there are pallets, also provide the overall dimensions with pallets and total weight. Goods on the shelves and the shelving itself should be listed separately, not just as one total item count.
Learn about the scope of dismantling and reassembly services
Heavy or special equipment
Acceptance can only be assessed once all information is complete
Provide the equipment model, external dimensions, weight, centre of gravity or original factory moving requirements (if any), and the packed dimensions. The item’s weight alone cannot be used to determine whether it can go through a lift; door width, internal cabin size, route and available equipment must also be checked. Whether the equipment can be moved, and whether special arrangements are needed, must be assessed separately first.
Access route
Check from the unit all the way to the loading point
Photograph the unit entrance, corridor corners, lift access, entry/exit points and the planned stopping point; record the clear width and clear height at narrower sections. Provide the management office's confirmed load capacity and time slot for the goods lift, and mark any steps or ramps along the way. Do not apply equipment specifications from other industrial buildings to Shun Luen Industrial Building.
Work suspension and vacant possession
Handle moving, disconnection and reinstatement as separate items
First list the work stoppage windows, available moving dates and unit handover deadline that need to be coordinated. Disconnecting power, network or other equipment is different from moving items; dismantling fixed fittings, clearing waste and reinstatement must also be listed separately. If phased moving or temporary storage is needed, state each batch of items and the destination, then confirm the quotation.
View restoration on vacant possession service
Moving arrangements for SHUN LUEN FACTORY BUILDING
Office furniture, shelving and equipment listed separately
For enquiries about Shun Luen Factory Building, please sort items by use. Separate office desks and chairs, document boxes, shelving, stock and equipment when providing counts; heavy or special equipment must be assessed first and cannot be confirmed movable based on the building name alone.
Freight lift details must include size and load capacity
Please confirm with the management office the lift entrance, internal dimensions, load limit and time slots, and then compare them with the largest item. If you do not yet have the information, you may first provide the model, photos and on-site route.
Separate the scope of moving-out and repositioning work
Moving furniture does not mean disconnection of equipment, dismantling of fixed fittings or reinstatement works are included. Lease requirements, fixtures to be kept and any separate works needed should be listed separately when you enquire.
Before you enquire
State the unit use and both addresses
Provide the floor, whether there is a lift, and the details of the property on the other side, and state whether it is an office, stock or other items move.
Organise dimensions, weight and item condition
Please provide the equipment model, photos, overall dimensions and weight; for shelving, state whether it has been cleared and whether dismantling is required.
Check the goods lift and parking position
Ask the management office about available equipment, load capacity, time slots and loading/unloading routes; do not rely on the rules of another industrial building.
Confirm the scope of stoppage, removal and reinstatement
List the moving time slots you would like us to fit in, as well as any packing, dismantling, disposal or handback restoration requirements, so the responsibilities and quotations for each task are clearly separated.
Frequently asked questions about SHUN LUEN FACTORY BUILDING
Where is Shun Luen Factory Building located?
The English name of Shun Luen Factory Building is Shun Luen Factory Building. It is located at 86 To Kwa Wan Road, Kowloon City District, and is an industrial property. Please provide the unit and floor when enquiring.
Can heavy equipment be confirmed as movable just from the industrial building address?
No. Heavy or special equipment requires the model, dimensions, weight, site route and lift availability to be provided first, then the scope of acceptance, moving method and manpower required can be assessed.
What is the freight lift load capacity and moving time at Shun Luen Factory Building?
This page has not verified the building's current goods lift weight limit, size or available moving hours. Please obtain the information from the management office; these conditions affect the moving method and should not be replaced by figures from another industrial building.
Does commercial relocation include disconnection of equipment and restoration to vacant handover condition?
Moving does not mean electrical or other equipment disconnection is included, nor does it mean reinstatement for handover is included. Please list the required items separately so customer service can confirm the scope we can handle and the quotation for each item.
For moving goods from Sun Luen Industrial Building, is the total weight of the goods enough on its own?
Not enough. In addition to the total weight, please provide the weight of each item or box, quantity, dimensions, packing method and whether upright transport is required. If pallets are used, please provide the pallet dimensions and total weight. These details must be assessed together with the floor level, lift and site route.
Can shelving, stock and documents be listed on the same inventory?
A single list can be used, but it should be split into different items. Shelving should list the number of sets, dimensions and whether dismantling is required; stock should list the number of boxes, dimensions and weight; document boxes should show the department or destination. Items that need to be moved in batches or to different addresses should also include the destination and handover time.