Skip to main content

Lobby Protection

Lobby protection in a building

Plan according to lobby flooring, pedestrian flow and management requirements.

Service highlights

Lobby protection must take into account stone or wooden flooring, resident movement and the moving route. We check the protection area, fixing method and workable time period to avoid the material edges lifting or obstructing public access, and remove it after completion as agreed and check the condition.

What's Included

Service details

  • Lobby flooring and route assessment
  • Protective covering along the designated route
  • Resident access and handover for dismantling

Service scope and items to be separately confirmed

  • Only items, work and handling arrangements confirmed in writing are included; extra dismantling/assembly, repairs, permit applications or third-party services are not automatically included in the standard moving fee.

How It Works

Service steps

  1. 1

    Provide details

    For a Lobby protection in a building enquiry, please prepare: Lobby floor plan and photos of flooring ; Management office-approved protection scope ; Resident access and work hours. Photos and a list can be sent via WhatsApp.

  2. 2

    Assessment and written confirmation

    Check Lobby flooring and route assessment 、 Protective covering along the designated route against the actual details, and only book after confirming the feasible plan, required permits, service boundaries and charges.

  3. 3

    Carry out according to the plan

    Work according to the confirmed list and time slot; if there are any additional items, route changes or safety restrictions on site, check with the customer first before proceeding.

  4. 4

    Handover check

    Check one by one against the agreed locations and items, with the designated contact person confirming completion; restarting equipment or professional handover inspection should be carried out according to the written responsibility arrangement.

Suitable situations

  • Enquiries about Lobby Protection
  • Plan according to lobby flooring, pedestrian flow and management requirements.

Pre-move preparation

  • Lobby floor plan and photos of flooring
  • Management office-approved protection scope
  • Resident access and work hours

FAQ

Related questions

Can the entire lobby be cordoned off for the move?

Prior management approval is required, and fire and safety access routes must be maintained. Public entrances must not be blocked.

What information is needed for Lobby protection in a building to provide a quote?

Please provide Lobby floor plan and photos of flooring 、 Management office-approved protection scope 、 Resident access and work hours, as well as contact details, service address and preferred date. If the photos are not enough to determine load-bearing capacity, route or site conditions, we will confirm whether an on-site assessment is needed.

What moving and support arrangements are included in the service?

Lobby flooring and route assessment ; Protective covering along the designated route ; Resident access and handover for dismantling. Confirm each required item before booking, and do not treat any unlisted extras as included.

What information should be prepared before moving?

Lobby floor plan and photos of flooring ; Management office-approved protection scope ; Resident access and work hours. Also list both addresses, the actual access route and the expected date; update the list if details change.

Instant Quote · No Tipping Charge

How much does moving cost? Get a quotation first

Provide the item list and moving addresses, and we will respond with a written quotation based on the information provided.