Skip to main content

Vending Machines

Vending machine moving

Tall items, glass doors, stock and internal parts should be secured first.

Service highlights

The vending machine is tall with concentrated weight, so the stock and cash must be cleared first. Please follow the manufacturer’s instructions to shut it down and secure any moving parts. We will check the centre of gravity, load points and access height; refrigeration, water supply or fixed footings will be handled separately first.

What's Included

Service details

  • Check machine status and weight
  • Protection for glass doors and mechanisms
  • Route assessment for tall items

Service scope and items to be separately confirmed

  • Only items, work and handling arrangements confirmed in writing are included; extra dismantling/assembly, repairs, permit applications or third-party services are not automatically included in the standard moving fee.

How It Works

Service steps

  1. 1

    Provide details

    For a Vending machine moving enquiry, please prepare: Model dimensions and weight ; Confirm disconnection and fixing after emptying ; Door height and floor load-bearing details. Photos and a list can be sent via WhatsApp.

  2. 2

    Assessment and written confirmation

    Check Check machine status and weight 、 Protection for glass doors and mechanisms against the actual details, and only book after confirming the feasible plan, required permits, service boundaries and charges.

  3. 3

    Carry out according to the plan

    Work according to the confirmed list and time slot; if there are any additional items, route changes or safety restrictions on site, check with the customer first before proceeding.

  4. 4

    Handover check

    Check one by one against the agreed locations and items, with the designated contact person confirming completion; restarting equipment or professional handover inspection should be carried out according to the written responsibility arrangement.

Suitable situations

  • Enquiries about Vending Machines
  • Tall items, glass doors, stock and internal parts should be secured first.

Pre-move preparation

  • Model dimensions and weight
  • Confirm disconnection and fixing after emptying
  • Door height and floor load-bearing details

FAQ

Related questions

Can goods and coins be moved together?

It should be emptied first and checked by the owner in charge, to avoid internal shifting, extra weight imbalance and disputes over handover of valuables.

What information is needed for Vending machine moving to provide a quote?

Please provide Model dimensions and weight 、 Confirm disconnection and fixing after emptying 、 Door height and floor load-bearing details, as well as contact details, service address and preferred date. If the photos are not enough to determine load-bearing capacity, route or site conditions, we will confirm whether an on-site assessment is needed.

What moving and support arrangements are included in the service?

Check machine status and weight ; Protection for glass doors and mechanisms ; Route assessment for tall items. Confirm each required item before booking, and do not treat any unlisted extras as included.

What information should be prepared before moving?

Model dimensions and weight ; Confirm disconnection and fixing after emptying ; Door height and floor load-bearing details. Also list both addresses, the actual access route and the expected date; update the list if details change.

Instant Quote · No Tipping Charge

How much does moving cost? Get a quotation first

Provide the item list and moving addresses, and we will respond with a written quotation based on the information provided.