Skip to main content

Central Kitchens

Central kitchen relocation

Plan according to production batch, hygiene zones and interfaces with large equipment.

Service highlights

Central kitchen relocation requires separation of clean areas, raw materials, semi-finished products and large equipment. We work with the client’s production changeover window and assess the move according to equipment isolation and cleanliness certificates. Food cold-chain, licences and restart are confirmed by the designated responsible party.

What's Included

Service details

  • Production area and equipment batch classification
  • Large kitchen equipment route assessment
  • Clean handover and supplier coordination

Service scope and items to be separately confirmed

  • Only items, work and handling arrangements confirmed in writing are included; extra dismantling/assembly, repairs, permit applications or third-party services are not automatically included in the standard moving fee.

How It Works

Service steps

  1. 1

    Provide details

    For a Central kitchen relocation enquiry, please prepare: Equipment and hygiene zoning plan ; Shutdown cleaning and isolation plan ; Cold-chain arrangements for ingredients and food. Photos and a list can be sent via WhatsApp.

  2. 2

    Assessment and written confirmation

    Check Production area and equipment batch classification 、 Large kitchen equipment route assessment against the actual details, and only book after confirming the feasible plan, required permits, service boundaries and charges.

  3. 3

    Carry out according to the plan

    Work according to the confirmed list and time slot; if there are any additional items, route changes or safety restrictions on site, check with the customer first before proceeding.

  4. 4

    Handover check

    Check one by one against the agreed locations and items, with the designated contact person confirming completion; restarting equipment or professional handover inspection should be carried out according to the written responsibility arrangement.

Suitable situations

  • Enquiries about Central Kitchens
  • Plan according to production batch, hygiene zones and interfaces with large equipment.

Pre-move preparation

  • Equipment and hygiene zoning plan
  • Shutdown cleaning and isolation plan
  • Cold-chain arrangements for ingredients and food

FAQ

Related questions

Can equipment be moved while production is ongoing?

A safe isolation zone and phased plan must be set up first; do not move items directly in an area where equipment has not been shut down or hygiene separation has not been completed.

What information is needed for Central kitchen relocation to provide a quote?

Please provide Equipment and hygiene zoning plan 、 Shutdown cleaning and isolation plan 、 Cold-chain arrangements for ingredients and food, as well as contact details, service address and preferred date. If the photos are not enough to determine load-bearing capacity, route or site conditions, we will confirm whether an on-site assessment is needed.

What moving and support arrangements are included in the service?

Production area and equipment batch classification ; Large kitchen equipment route assessment ; Clean handover and supplier coordination. Confirm each required item before booking, and do not treat any unlisted extras as included.

What information should be prepared before moving?

Equipment and hygiene zoning plan ; Shutdown cleaning and isolation plan ; Cold-chain arrangements for ingredients and food. Also list both addresses, the actual access route and the expected date; update the list if details change.

Instant Quote · No Tipping Charge

How much does moving cost? Get a quotation first

Provide the item list and moving addresses, and we will respond with a written quotation based on the information provided.